Schedule
Roughly four days per finished minute, counted from confirmed materials and script. Rush slots are confirmed with the director first.
PRICING
We charge by the finished second and put the rate in the open. Where a project lands in that range depends on how much modelling and VFX each shot needs. The longer the film, the lower the cost per second — which is why a full film costs less than the rate suggests.
Base rate / per finished second
110–250CNY / second
This is the base production rate. Modelling, VFX, rush work and voice-over are not bundled in — they are quoted on their own workload and itemised in the estimate.
WHAT IT ADDS UP TO
Most of our projects run several minutes. The rate per second falls as the runtime grows — the part that is easiest to misread.
| Runtime | At 110 CNY/s | At 250 CNY/s |
|---|---|---|
| 1 min | 6.6k | 15k |
| 2 min | 13.2k | 30k |
| 3 min | 19.8k | 45k |
| 5 min | 33k | 75k |
Production fee ranges only, excluding separately quoted items. The shot-by-shot estimate governs.
INCLUDED
QUOTED SEPARATELY
Each is quoted on its own workload and itemised in the estimate, not buried in a total.
HOW IT RUNS
Roughly four days per finished minute, counted from confirmed materials and script. Rush slots are confirmed with the director first.
Once scope and quote are agreed we sign the contract and take the deposit, then production starts. The balance follows the contract milestones.
After the contract and deposit we make a 5-second sample. If the sample misses, that stage is refunded in full; once you approve the full-film previz, no refunds apply.
A preliminary quote within 30 minutes of complete materials; scope and the final price are confirmed in conversation.
GET A QUOTE
One drawing and a short description are enough for me to start costing. If you are still deciding, we can simply talk it through.
LET’S MAKE IT CLEAR
A machine drawing, a paragraph of notes, or an idea that is not shaped yet. We start with what you want the audience to understand.
Start a project