INDUSTRY / PROCESS

3D animation for chemical and process plants

A process flow diagram shows which machine the material passes through. It cannot show what happens inside. Animation opens the internals, the change in material state and the sequence at the same time.

The hard part of process industries is continuity: material passes from one machine into the next with no real break, yet a presentation needs chapters. Flow diagrams give boxes and arrows, P&IDs give piping logic, and neither answers what the material looks like at a given moment, where temperature changes, or why a step cannot be skipped. That is the gap animation fills.

WHY IT IS HARD

Process documentation is the worst medium for a process

01Diagrams have no interior

Boxes and arrows cannot show what happens inside the equipment, which is exactly what has to be judged: how the bed tumbles, how heat is exchanged, how material is reduced.

02Parameters are invisible

Temperature, pressure, residence time and reaction stage decide whether the process works, and on paper they are only numbers. They build no impression in a review meeting.

03You cannot film inside

Heat, pressure, dust and sealed vessels make filming impossible and unsafe. Some stages are never opened while the plant is running.

04Everyone reads it differently

Design institute, owner and operators each understand the same process to a different depth. By the third drawing revision they still disagree, and the process engineer absorbs the cost.

WHAT WE ANIMATE

Shots a process film usually contains

Not a render of the whole line, but three to five process stages fixed first, then broken into shots.

  1. 01

    The full material route

    Follow the material from infeed to discharge on one continuous thread. The route is remembered far better than the equipment names.

  2. 02

    Sections through key equipment

    Kiln shell and burden, mill rotor and screen, roller press and ring die — only a section explains what the machine is actually doing.

  3. 03

    Change of material state

    Powder to granule, wet to dry, lump to aggregate. State change is how a viewer judges which stage they are watching.

  4. 04

    Temperature and reaction zones

    Colour bands and state changes turn unseen parameters into visible information, marking heating, holding and reaction zones.

  5. 05

    Splitting and rejoining routes

    Where branches divert and where they return is told in separate passages with separate camera positions, never mixed in one shot.

RELATED WORK

Related process work

Public films below — open them to see how the material route runs and where the sections are placed.

DELIVERY

Delivery

Resolution
1080p as standard, 4K on request
Format
MP4 / H.264, drops into slides, tender documents and trade-show screens
Camera language
Route tracking, equipment sections, parameter overlays
Modelling input
Process flow diagrams, equipment drawings or photos, client process data
Schedule
About 4–5 days per finished minute, from complete material and an approved script

PRICING

What this kind of project costs

Priced per finished second at 110–250 CNY: about 6.6–15k per minute, 19.8–45k for three minutes. Equipment exteriors and route flow sit at the low end; internal sections, state changes and powder or fluid simulation push towards the high end. The quotation itemises shots.

See the full pricing note ↗

FAQ

Three questions process clients ask

We only have part of the process data. Can you still do it?

Yes. The film goes exactly as far as the data does, and where data is missing the picture stays schematic rather than inventing numbers.

The internals are confidential. What if we cannot release drawings?

The usual answer is a schematic section: correct relative positions and motion logic, simplified dimensions and structural detail. Under NDA, redacted drawings work too.

How long does a three-minute process film take?

About 12–15 working days from complete material and an approved script. Most of the front end goes into settling the process order and section positions; leaving that unresolved is what makes rework expensive.

INDUSTRY / PROCESS

Send the process diagram and equipment list

With a flow diagram I can come back with three shot ideas and an approximate duration band; a preliminary quote follows within 30 minutes once material is complete.

Start a project

LET’S MAKE IT CLEAR

The next shot
is your product.

A machine drawing, a paragraph of notes, or an idea that is not shaped yet. We start with what you want the audience to understand.

Start a project
Mechanics / Production / ProductKAIFENG, CHINA · EST. 2022