INDUSTRY / GEOTHERMAL

3D animation for geothermal systems and clean heating

The hard part of geothermal is that it is invisible: kilometres of rock, sealed wells, circulating fluid. One section drawing is what brings the underground and the surface into the same frame.

A geothermal project usually speaks to three audiences: authorities, investors and the heat users themselves. They care about different things, but all three need the same basic picture first — where the heat comes from, how the water circulates, and why the system can run for decades. None of it is visible from the surface, so it can only be explained through sections and paths.

WHY IT IS HARD

The whole system sits out of sight

01Nothing underground is visible

Boreholes run kilometres deep while the surface plant is tens of metres wide. Drawing both in one image means several orders of magnitude of difference.

02The loop is abstract

Extraction, heat exchange, reinjection, recirculation. Describing it in words takes paragraphs; one section makes it obvious.

03Clean-heating claims need credibility

These projects arrive with a policy context, so the film has to persuade without overstating heat output or emission savings.

04Nothing built to film

Drilling takes months and the surface plant is still under construction, so at briefing time there is often no site to shoot.

WHAT WE ANIMATE

Shots a geothermal film usually contains

Connect underground, surface and network first, then add local principle as needed — never two scales mixed in one passage.

  1. 01

    One section joins above and below

    Surface buildings and borehole share a frame, which is what gives the scale difference a reference. The compression ratio is a deliberate choice, and it must be clear this is schematic rather than measured depth.

  2. 02

    The extraction and reinjection loop

    Production well, heat exchange, reinjection well — one loop carried through with no skipped links.

  3. 03

    Strata and well construction

    Colour and texture of the strata are how a viewer knows they are underground; casing, cementing and perforation are what make the project credible.

  4. 04

    Surface plant and heat exchange

    How heat pumps, exchangers and circulation pumps interlock, and how heat enters the network.

  5. 05

    Network and end users

    Heat travelling from the plant to substations to users closes the system.

RELATED WORK

Related geothermal and energy work

Two public films on the same subject: one leans on scale compression and sections, the other on system composition and operation.

DELIVERY

Delivery

Resolution
1080p as standard, 4K on request
Format
MP4 / H.264, drops into slides, tenders, review briefings and trade-show screens
Camera language
Section continuity, loop tracking, system wides
Modelling input
Well construction drawings, system schematics, equipment drawings or photos, site geology
Schedule
About 4–5 days per finished minute, from complete material and an approved script

PRICING

What this kind of project costs

Priced per finished second at 110–250 CNY: about 6.6–15k per minute, 19.8–45k for three minutes. Scale compression in sections and stratified ground modelling are the main workload, so price rises with the number of sections and the geological detail. The quotation itemises shots.

See the full pricing note ↗

FAQ

Three questions geothermal clients ask

Well depth is confidential. Is that a problem?

Most projects can be expressed with relative depths and a schematic ratio, without real coordinates or exact depths. Where precision is required, redacted drawings under NDA work.

Will you suggest heat output or emission figures?

No. Those numbers must come from the client and be confirmed by the client. The film expresses them; it does not derive them, and it does not replace a resource assessment or an energy-saving calculation.

Can one film serve both government briefings and investment material?

Usually yes. Where the investment version needs to be more promotional, a short opening can be cut from the same shots.

INDUSTRY / GEOTHERMAL

Send the well construction drawing and system schematic

With a schematic I can come back with three shot ideas and an approximate duration band; a preliminary quote follows within 30 minutes once material is complete.

Start a project

LET’S MAKE IT CLEAR

The next shot
is your product.

A machine drawing, a paragraph of notes, or an idea that is not shaped yet. We start with what you want the audience to understand.

Start a project
Mechanics / Production / ProductKAIFENG, CHINA · EST. 2022